活動板房是一種以輕鋼為骨架,以夾芯板為圍護材料,以標(biāo)準(zhǔn)模數(shù)系列進行空間合,構(gòu)件采用螺栓連接,全新概念的經(jīng)濟型活動板房屋??煞奖憧旖莸剡M行組裝和拆卸,實現(xiàn)了臨時建筑的通用標(biāo)準(zhǔn)化,樹立了、快捷的建筑理念。那么,你知道活動板房規(guī)格有哪些嗎?安裝注意事項有哪些呢?不知道也沒關(guān)系,今天要為大家介紹的就是
濟南活動板房規(guī)格及安裝注意事項,希望能夠幫助到有這方面需求的朋友們!
The movable board house is a new concept of environmental protection and economic movable board house, which takes light steel as skeleton, sandwich panel as enclosure material, standard modulus series for space combination, and bolt connection for components. It can be easily and quickly assembled and disassembled, realizing the general standardization of temporary buildings, and establishing the building concept of environmental protection, energy saving, fast and efficient. So, do you know what are the specifications of prefabricated houses? What are the installation precautions? I don't know, it doesn't matter. What I'm going to introduce to you today is the specifications and installation precautions of the prefabricated house. I hope that we can help the friends who have this demand!
活動板房的規(guī)格:
Specification of prefabricated house:
標(biāo)準(zhǔn)尺寸是外邊尺寸加160mm,例如山墻寬度常用的一般有2K的是3800mm、3K的是5620mm、4K的是7440mm,房屋開間一般是3640mm。
The standard size is the outer dimension plus 160mm. For example, the commonly used gable width is 3800 mm for 2K, 5620mm for 3k, 7440mm for 4K, and 3640mm for House Bay.
如果一棟3K*2K*3P的房屋只有1間,那么外邊的尺寸就是山墻5620mm,開間方向外墻尺寸3800mm。
If there is only one 3K * 2K * 3P house, then the external dimension is the gable 5620mm, and the external wall dimension of the Bay direction is 3800mm.
活動板房的安裝事項:
Installation items of movable plank house:
1、活動板房安裝完整后,用戶不得擅自更改結(jié)構(gòu),不得拆卸任何螺栓構(gòu)件,不得增加或減少隔墻,如需要更改應(yīng)與廠方協(xié)商同意后方可改變。
1. After the movable plank house is installed completely, the user is not allowed to change the structure, dismantle any bolt components, add or reduce the partition wall. If it is necessary to change, the user should consult with the manufacturer before changing.
2、活動板房系鋼結(jié)構(gòu)件整棟連接,用戶布置用電照明設(shè)備,電線不能直接綁扎在鋼結(jié)構(gòu)上,應(yīng)設(shè)線管或線槽隔離安裝,以免發(fā)生觸電。
2. The movable board house is connected with the steel structure of the whole building. The user shall arrange the electric lighting equipment. The wires shall not be bound on the steel structure directly. Instead, they shall be installed with conduit or trunking to avoid electric shock.
3、輕鋼結(jié)構(gòu)件應(yīng)在1-2年保養(yǎng)油漆一次,以延長本產(chǎn)品壽命和保持美觀。
3. The light steel structure should be maintained once every 1-2 years to prolong the service life of the product and maintain its beauty.
以上就是
濟南活動板房規(guī)格及安裝注意事項的相關(guān)介紹,相信通過我以上對活動板房的介紹,大家也有了進一步的了解。如需了解更多的相關(guān)資訊,請繼續(xù)關(guān)注我們網(wǎng)站:
http://hxwjw.org.cn。
The above is the relevant introduction of the specifications and installation precautions of the prefabricated house. I believe that through the introduction of the prefabricated house above, we also have a further understanding. For more information, please stay tuned to our website: http://hxwjw.org.cn 。