1、不要片面地在檁條的拉條孔上考慮“受拉邊、受壓邊”等要素,打出上下邊距不等的孔穴,因為設(shè)備時是很簡略裝反的,效果反而倒霉。
1. Do not unilaterally consider the elements such as "tension edge and pressure edge" on the brace hole of purlin, and make holes with unequal upper and lower edge spacing, because the equipment is simply installed reversely, and the effect is unlucky.
2、門窗等的包角板不能相提并論,因為在施工中你無法保證板件位于壓型板的波峰仍是波谷。
2. The angle wrapping plates of doors and windows can not be compared, because you can't guarantee that the plates are located at the crest or trough of the profiled plate during construction.
3、做大型工程時,深化圖編號一定要考慮到出產(chǎn)、發(fā)貨、設(shè)備的便捷。
3. When doing large-scale projects, the convenience of production, delivery and equipment must be taken into account in deepening drawing numbering.
4、假設(shè)有天溝,系桿不能計劃到緊貼著柱頂?shù)牟课唬駝t將或許致使無法設(shè)備落水管。另外天溝落水管和系桿以及柱間支撐的方位一定要考慮好,否則要么碰到系桿,要么碰到柱間支撐。
4. If there is a gutter, the tie rod cannot be planned to be close to the top of the column, otherwise the equipment downpipe may not be available. In addition, the orientation of gutter downpipe, tie rod and inter column support must be considered, otherwise it will either encounter tie rod or inter column support.
5、成都活動板房水平支撐上花籃螺栓方位的安頓要合理,不要過于違背主梁,應(yīng)當(dāng)考慮便當(dāng)設(shè)備為主。否則工人在設(shè)備時有必要探出身子來擰緊花籃螺栓或許用爬梯上去,要么等檁條設(shè)備結(jié)束后爬上檁條擰緊花籃螺栓這樣非常不。另外也要考慮一下隅撐的安頓方位,不要在安頓水平支撐時與隅撐打架。
5. The orientation of flower basket bolts on the horizontal support of Chengdu movable plank house shall be reasonable, not too contrary to the main beam, and convenient equipment shall be considered. Otherwise, it is necessary for the workers to lean out to tighten the flower basket bolts during the equipment, perhaps climb the ladder, or climb up the purlin to tighten the flower basket bolts after the purlin equipment is completed, which is very unsafe. In addition, consider the setting position of the corner brace, and do not fight with the corner brace when setting the horizontal support.
6、對甲方供給的“荷載等數(shù)據(jù)”一定要了解其實在的意思,因為甲方一般不太懂這些太的東東。我們要做到換位考慮,前期工作做好了,后續(xù)工作就好打開的多了。
6. We must understand the meaning of "load and other data" provided by Party A, because party a generally does not understand these things. We should consider transposition. If the preliminary work is done well, the follow-up work will be much easier to open.
7、高強螺栓的方位要合理,要考慮扭斷器及扭矩扳手的施工空間,不要在設(shè)備時,因為空間太小,扭斷器及扭矩扳手無法就位等,致使高強螺栓梅花頭無法擰斷或高強螺栓無法擰緊。曾經(jīng)碰到過有的計劃連套筒的方位都不給。
7. The orientation of the high-strength bolt shall be reasonable, and the construction space of the torsion breaker and torque wrench shall be considered. Do not use the equipment because the space is too small and the torsion breaker and torque wrench cannot be in place, so that the ring head of the high-strength bolt cannot be screwed off or the high-strength bolt cannot be tightened. I have encountered some plans that don't even give the orientation of the sleeve.
8、高強螺栓聯(lián)接板假設(shè)有或許,盡量選用上下對稱的螺栓安頓辦法。曾經(jīng)有中接點上面4個下面6個,車間工人搭裝不小心將一部分搞反了,在現(xiàn)場對不住來。
8. If the high-strength bolt connecting plate is false, try to use the bolt installation method with symmetrical up and down. Once there were 4 middle contacts above and 6 below. The workshop workers accidentally reversed some of them. I'm sorry at the scene.
9、輕鋼結(jié)構(gòu)假設(shè)有保護磚墻,一定要提早與建設(shè)單位及土建施工單位對接好,因為這涉及到土建和鋼結(jié)構(gòu)兩個方面的疑問,因為土建的磚墻很或許搞不平直,可彩鋼板的泛水又不或許做得忽大忽小,
9. If the light steel structure is provided with protective brick walls, it must be connected with the construction unit and civil construction unit in advance, because this involves the questions of civil engineering and steel structure, because the brick walls of civil engineering may be uneven, but the flashing of color steel plate may not be large or small,