一,注意人身,施工單位要為職工提供充足的飲食和發(fā)放香油、風(fēng)冷藥品等用途。露天和高溫作業(yè)人員應(yīng)多喝茶水、綠豆湯和鹽濃度在0.1-0.3%的冷飲,但每次不超過300毫升。嚴(yán)禁建筑工人赤膊上陣、穿拖鞋或在酒精影響下工作。
1、 Pay attention to personal safety, and the construction unit shall provide sufficient food and drink for the staff and distribute scented oil, air-cooled drugs and other purposes. Open air and high temperature operators should drink more tea, mung bean soup and cold drinks with a salt concentration of 0.1-0.3%, but not more than 300 ml each time. It is strictly forbidden for construction workers to go to work naked, wear slippers or work under the influence of alcohol.
其次,在雨天施工時,彩鋼房工程宜設(shè)置臨時防護(hù)棚,雨水不得落在熱焊縫上。如果焊接部位較濕,焊接前必須用干布擦拭干凈,用氧乙炔火焰烘干,以保持接頭干燥,無殘留水分。如果組件上有水,應(yīng)該在安裝前進(jìn)行清洗。然而,涂層不應(yīng)該被損壞。高強度螺栓連接安裝時,構(gòu)件的摩擦面應(yīng)保持清潔。
Secondly, during the construction in rainy days, the temporary protective shed should be set up for the colored steel house project, and the rainwater should not fall on the hot weld. If the welding part is wet, it must be wiped clean with dry cloth before welding, and dried with oxyacetylene flame to keep the joint dry without residual moisture. If there is water on the components, they should be cleaned before installation. However, the coating should not be damaged. During the installation of high-strength bolt connection, the friction surface of the component shall be kept clean.
還有就是,工程雨天天氣成分不能進(jìn)行涂刷工作。屋頂保溫施工不能在雨天和5級以上大風(fēng)天氣進(jìn)行。在雨天,由于空氣潮濕,焊條應(yīng)貯存防潮并烘烤,同一焊條再烘烤的次數(shù)不應(yīng)超過兩次,并由管理人員及時烘烤記錄。施工中遇到大風(fēng)時,應(yīng)立即對柱、主梁、支座等大型構(gòu)件進(jìn)行糾正,并在糾正正確位置后立即進(jìn)行固定,防止單側(cè)失穩(wěn)。同安裝的部件應(yīng)構(gòu)成空間穩(wěn)定系統(tǒng)。
In addition, the components of the project cannot be painted in rainy days. Roof insulation construction shall not be carried out in rainy days and windy days above level 5. In rainy days, due to the humid air, the welding rod shall be stored, moistured and baked. The same welding rod shall not be baked more than twice, and the baking record shall be made by the management personnel in time. In case of strong wind during construction, the column, main beam, support and other large components shall be corrected immediately, and fixed immediately after the correct position is corrected to prevent single side instability. Components installed on the same day shall form a space stability system.
以上是
濟(jì)南彩鋼板房廠家為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問網(wǎng)站:http://hxwjw.org.cn
The above is the relevant content introduced by Jinan color steel plate house manufacturer. If you want to know more, please visit the website: http://hxwjw.org.cn