您好,歡迎訪問(wèn)禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門(mén)關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房
當(dāng)前位置:首頁(yè)>新聞資訊>新聞動(dòng)態(tài)濟(jì)南工程板房搭建有哪些施工要求?

濟(jì)南工程板房搭建有哪些施工要求?

來(lái)源:http://hxwjw.org.cn 日期:2020-08-03 發(fā)布人:
活動(dòng)板房安裝必須具有在技術(shù)監(jiān)督備案才能進(jìn)行施工,并且活動(dòng)板房的生產(chǎn)企業(yè),應(yīng)提供完整的建筑結(jié)構(gòu)安裝圖紙、產(chǎn)品出廠合格證、材質(zhì)證明及檢測(cè)報(bào)告、使用說(shuō)明書(shū)、相關(guān)驗(yàn)收標(biāo)準(zhǔn)等。那么濟(jì)南工程板房搭建有哪些施工要求? 
The installation of prefabricated house must be put on the record of technical supervision before construction, and the manufacturer of prefabricated house shall provide complete building structure installation drawings, product ex factory certificate, material certificate and test report, operation instruction and relevant acceptance standards. What are the construction requirements for the construction of slab house in Jinan?
濟(jì)南工程板房搭建施工要求
Construction requirements of slab house construction in Jinan project
(1)活動(dòng)板房安裝,應(yīng)由具有相應(yīng)資質(zhì)的施工企業(yè)、或生產(chǎn)廠家承擔(dān)。安裝單位應(yīng)根據(jù)合同文件、安裝圖紙以及相關(guān)標(biāo)準(zhǔn)編制安裝施工方案,并按方案組織實(shí)施。
(1) The installation of prefabricated houses shall be undertaken by construction enterprises or manufacturers with corresponding qualifications. The installation unit shall prepare the installation construction scheme according to the contract documents, installation drawings and relevant standards, and organize the implementation according to the scheme.
(2)活動(dòng)板房層數(shù)更多不應(yīng)超過(guò)2層,每層建筑面積不應(yīng)超過(guò)300㎡,并且大于200㎡時(shí),其疏散樓梯的數(shù)量不應(yīng)少于2部。
(2) The number of floors of prefabricated house shall not exceed 2, and the building area of each floor shall not exceed 300 m2. When the floor area is more than 200 m2, the number of evacuation stairs shall not be less than 2.
房間門(mén)樓梯的距離不應(yīng)大于25m,樓梯的凈寬不應(yīng)小于1.1m。宿舍房間的建筑面積不應(yīng)大于30㎡,房間門(mén)應(yīng)朝疏散方向開(kāi)啟。
The maximum distance between the room door and the stairs should not be greater than 25m, and the clear width of the stairs should not be less than 1.1m. The building area of the dormitory room should not be greater than 30 m2, and the room door should be opened towards the evacuation direction.
(3)活動(dòng)板房安裝完成后,應(yīng)由安裝單位進(jìn)行自檢,經(jīng)自檢合格后應(yīng)由施工總承包單位組織監(jiān)理單位、使用單位、安裝單位進(jìn)行聯(lián)合驗(yàn)收,合格后方可交付使用。
(3) After the installation of prefabricated house is completed, the installation unit shall carry out self inspection. After passing the self inspection, the general contractor shall organize the supervision unit, the user and the installation unit to carry out joint acceptance, and the house can be delivered for use only after it is qualified.
以上就是濟(jì)南工程板房搭建有哪些施工的全部?jī)?nèi)容了,如果你還有關(guān)于濟(jì)南工程板房的問(wèn)題,請(qǐng)咨詢(xún)?cè)诰€客服,或者直接致電咨詢(xún)!
The above is the whole content of Jinan project board room construction, if you have any questions about Jinan project board room, please consult online customer service, or call directly for consultation!

聯(lián)系電話:18765446878

咨詢(xún)熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

99国产精品久久久| 久久家庭乱视频| 7777精品伊久久久大香线蕉| 欧美一二区激情视频| 国产综合在线视频| 91精产国品的产超碰| 三月蜜桃丁香激情| 永久不封国产毛片av网煮站| 亚洲狠狠操| 久久久久性视频| 部长侵犯人妻一区二区三区| 白嫩丰满孕妇孕交| 国产手机看片日韩| 九九热精品视频| 午夜无码AV| 黄片2级观看| 暧暖无码视频www| 久久VPN| 性欧美大战久久久久久久久| 国产精品视频免费网站| 中文无码日韩一区二区| 97久久国产亚洲精品超碰热| 国产黄色视频在线| 操逼综合网| 四虎影视最新亚洲| wwwA级视频| 国产清纯在线一区二区WWW| av伊一二三区| 97国产中文字幕在线| xxx。国产| 无码农村少妇AV| 成人每日更新| 成人黄色免费av| www.日韩一区二区| av 这里只有精品| 久久中文字幕无码精品| 无码一本二本| 四虎在线免费观看亚洲| 91mdav| 五月婷之久久| 精品99 久久|