1)活動(dòng)的原部件進(jìn)行改造房間的加固設(shè)計(jì),施工和承諾,力爭(zhēng)達(dá)到單位,施工單位根據(jù)確定的經(jīng)驗(yàn)和更合理的設(shè)計(jì)實(shí)施的活動(dòng)板房水平。
1) The original parts of the activity to transform the room reinforcement design, construction and commitment, and strive to achieve the unit, the construction unit according to the determined experience and more reasonable design and implementation of the activity board room level.
2)鋼筋混凝土結(jié)構(gòu)房屋使用年限,由業(yè)主和設(shè)計(jì)單位,一般為30年指定的同意。當(dāng)?shù)氐纳罱Y(jié)構(gòu)和結(jié)構(gòu)加固已使用和不超過50年的年數(shù),作為業(yè)主項(xiàng)目要求或特殊需要的結(jié)果,有一個(gè)較長(zhǎng)的壽命,應(yīng)采取的措施旨在活動(dòng)板房加強(qiáng)如果有必要,們將召開會(huì)議,討論確定解決方案。原有的抗震設(shè)計(jì),低強(qiáng)度的或舊的混凝土房屋結(jié)構(gòu)的抗震設(shè)防標(biāo)準(zhǔn)設(shè)計(jì),加固活動(dòng)板房改造現(xiàn)有規(guī)范的大部分是難以達(dá)到設(shè)計(jì)要求。
2) The service life of the reinforced concrete structure house is generally 30 years as agreed by the owner and the design unit. The local living structure and structural reinforcement have been used for no more than 50 years. As a result of the owner's project requirements or special needs, it has a long life. The measures to be taken are aimed at strengthening the prefabricated house. If necessary, experts will hold a meeting to discuss and determine the solution. The original seismic design, low-strength or old concrete building structure seismic fortification standard design, strengthening activity plank house transformation, most of the existing specifications are difficult to meet the design requirements.
3)活動(dòng)房加固由有資格的設(shè)計(jì)單位或科研單位進(jìn)行加固改造活動(dòng)板房設(shè)計(jì)應(yīng)。
3) The reinforcement of the movable house shall be carried out by the qualified design unit or scientific research unit, and the design of the movable board house shall be carried out.
4)鑒定和檢測(cè)修改鋼筋的施工圖設(shè)計(jì)文件,但也需要與新的建筑施工圖文件,發(fā)送文件審查施工圖審查部門,如果在一樓門面或大型臨時(shí)改造的主要街道上的原始屋頂,活動(dòng)板房設(shè)計(jì)中應(yīng)由當(dāng)?shù)匾?guī)劃部門批準(zhǔn)的設(shè)計(jì)文件,應(yīng)與新的工程設(shè)計(jì)存檔。xH5浙江大廈網(wǎng)絡(luò)7相同。
4) Identify and test the construction drawing design documents of the modified reinforcement, but also need to be sent with the new construction drawing documents to the construction drawing review department for document review. If the original roof is on the first floor facade or the main street of the large-scale temporary reconstruction, the design documents that should be approved by the local planning department in the design of the prefabricated house should be filed with the new engineering design. Xh5 Zhejiang building network 7 is the same.
改造設(shè)計(jì)中使用的加固材料應(yīng)輕,以利于減少地震反應(yīng),以避免原有的基礎(chǔ)上進(jìn)行加固;層應(yīng)提高鋼結(jié)構(gòu)屋頂?shù)氖褂?,輕維護(hù)結(jié)構(gòu);原子結(jié)構(gòu),減少或沒有加固,以較低的房屋使用的影響,減少活動(dòng)板房電力傳輸加固原來的組成部分,應(yīng)明確,結(jié)構(gòu)簡(jiǎn)單,無(wú)損傷或損傷較小的現(xiàn)有結(jié)構(gòu),活動(dòng)板房施工方便,成本低的方案;需要考慮力滯后造成材料的強(qiáng)度增加的壓力,應(yīng)該是新標(biāo)準(zhǔn)的第二部分,法規(guī)做出相應(yīng)的折扣;應(yīng)遵循加固施工簡(jiǎn)單,方便,我們可以保證活動(dòng)板房質(zhì)量,這是一個(gè)原因。
The reinforcement materials used in the reconstruction design should be light, so as to reduce the seismic response and avoid reinforcement on the original foundation; The use of steel roof should be improved and the structure should be maintained lightly; Atomic structure, reduce or no reinforcement, to lower the impact of housing use, reduce the power transmission reinforcement of the original components of the prefabricated house, should be clear, simple structure, no damage or less damage to the existing structure, the prefabricated house construction is convenient, low cost program; It should be the second part of the new standard to consider the pressure of material strength increase caused by force lag, and the corresponding discount should be made by the regulations; Should follow the reinforcement construction is simple, convenient, we can ensure the quality of prefabricated house, this is a reason.