不同設(shè)計(jì)
Different design
集裝箱房由來已久,國(guó)內(nèi)外都引進(jìn)了現(xiàn)代家居元素,以單一的箱體為單元,可以任意組合和疊加,密封、隔聲、防火、防潮、保溫等方面的性能較好。該活動(dòng)房是以鋼、板等原材料為基礎(chǔ)進(jìn)行現(xiàn)場(chǎng)安裝、密封、隔聲、防火、防潮、保溫、保溫等性能較差,*等到安裝后才知道效果如何,這不利于人們的比較和選擇。
Container house has a long history. Modern household elements have been introduced at home and abroad. Taking a single box as a unit, it can be combined and superimposed arbitrarily. It has good performance in sealing, sound insulation, fire prevention, moisture prevention, thermal insulation and so on. The activity room is based on steel, plate and other raw materials for on-site installation, sealing, sound insulation, fire prevention, moisture-proof, thermal insulation, thermal insulation and other poor performance, * the effect will not be known until after installation, which is not conducive to people's comparison and selection.
結(jié)構(gòu)方面
Structural aspects
集裝箱房整體結(jié)構(gòu)的焊接更加牢固、,抗風(fēng)能力強(qiáng),抗震能力強(qiáng),在臺(tái)風(fēng)、地震、地面沉降等災(zāi)害中不會(huì)分散倒塌。但活動(dòng)房是鑲嵌結(jié)構(gòu),阻力小,遇到地基不牢固,臺(tái)風(fēng)、地震等,容易發(fā)生事故,系數(shù)相對(duì)較低。
The welding of the overall structure of the container house is more firm and safe, with strong wind resistance and earthquake resistance. It will not collapse in typhoon, earthquake, land subsidence and other disasters. However, the movable house is a mosaic structure with small resistance. In case of unstable foundation, typhoon and earthquake, it is prone to accidents, and the safety factor is relatively low.
安裝方面
Installation
集裝箱可整箱吊裝,不需做混凝土基礎(chǔ),15分鐘安裝,1小時(shí)入住,可使用街道供電。活動(dòng)房的安裝需要做混凝土基礎(chǔ),建造主體,安裝墻壁,吊頂,安裝水電等,所需時(shí)間略長(zhǎng)于集裝箱房。
The container can be hoisted in a whole container without concrete foundation. It can be installed in 15 minutes and checked in for 1 hour. Street power supply can be used. The installation of the mobile room requires concrete foundation, construction of the main body, installation of walls, ceiling, installation of water and electricity, etc., which takes slightly longer than that of the container room.
裝飾方面
Decoration
集裝箱房的裝飾可以和普通一樣,無論是墻壁、地板、屋頂、水電、門窗、排氣扇等,都可以一次裝潢到位,即?;顒?dòng)房的墻壁和天花板、水電、照明、門窗等設(shè)施都需要現(xiàn)場(chǎng)安裝,施工周期長(zhǎng),損失大,美觀比活箱小。
The decoration of the container room can be the same as that of ordinary buildings. Whether it is walls, floors, roofs, water and electricity, doors and windows, exhaust fans, etc., it can be decorated in place at one time, that is, energy conservation and environmental protection. The wall and ceiling, water and electricity, lighting, doors and windows and other facilities of the movable room need to be installed on site. The construction period is long, the loss is large, and the beauty is smaller than that of the movable box.
使用方面
Use aspect
集裝箱房的設(shè)計(jì)更加人性化,生活和辦公應(yīng)更加舒適,可以隨時(shí)增加或減少房間數(shù)量,不僅方便而且靈活?;顒?dòng)房的隔音和防火性能較差,居民和辦公室的舒適性普遍。安裝后,固定成型后的房間數(shù)量不能暫時(shí)增加或減少。
The design of container room is more humanized, life and office should be more comfortable, and the number of rooms can be increased or reduced at any time, which is not only convenient but also flexible. The noise insulation and fire prevention performance of the activity room is poor, and the comfort of residents and offices is common. After installation, the number of rooms after fixed forming cannot be temporarily increased or reduced.
移動(dòng)方面
Mobile aspect
使用后不需要拆掉,房間里的物品可以和箱子一起移動(dòng),沒有磨損,可以吊起,可以移動(dòng)多少次,既方便又節(jié)省成本。活動(dòng)房屋的搬遷需要拆除和重新安裝,項(xiàng)目要打包,每個(gè)拆裝材料的成本仍然很高,需要時(shí)間和精力。拆裝四、五次后,基本上就會(huì)被砍掉。
There is no need to dismantle after use. The articles in the room can be moved together with the box without wear. They can be lifted and moved many times, which is convenient and cost-effective. The relocation of movable houses requires demolition and reinstallation, and the project needs to be packaged. The cost of each disassembly and assembly material is still very high, which requires time and energy. After being disassembled four or five times, it will basically be cut off.