工地工程板房搭建有哪些施工要求

來源:http://hxwjw.org.cn 日期:2022-11-02 發(fā)布人:
工程板房安裝須具有在技術(shù)監(jiān)督備案才能進(jìn)行施工,并且工程板房的生產(chǎn)企業(yè),應(yīng)提供完整的建筑結(jié)構(gòu)安裝圖紙、產(chǎn)品出廠合格證等。那么,工地濟(jì)南工程板房搭建有哪些施工要求?下面跟小編一起來了解一下!
The installation of engineering plank houses can only be carried out after being filed in the technical supervision, and the manufacturer of engineering plank houses shall provide complete building structure installation drawings, product factory certificates, etc. So, what are the construction requirements for the construction of plank houses in Jinan Project? Now let's get to know with Xiao Bian!
一、工地工程板房搭建施工要求
1、 Construction requirements for construction of plank house on construction site
(1)工程板房安裝,應(yīng)由具有相應(yīng)資質(zhì)的施工企業(yè)、或生產(chǎn)廠家承擔(dān)。安裝單位應(yīng)根據(jù)合同文件、安裝圖紙以及相關(guān)標(biāo)準(zhǔn)編制安裝施工方案,并按方案組織實(shí)施。
(1) The installation of engineering plank houses shall be undertaken by construction enterprises or manufacturers with corresponding qualifications. The installation unit shall prepare the installation construction scheme according to the contract documents, installation drawings and relevant standards, and organize the implementation according to the scheme.
(2)工程板房層數(shù)多不應(yīng)超過2層,每層建筑面積不應(yīng)超過300㎡,并且大于200㎡時(shí),其疏散樓梯的數(shù)量不應(yīng)少于2部。房間門樓梯的大距離不應(yīng)大于25m,樓梯的凈寬不應(yīng)小于1.1m。宿舍房間的建筑面積不應(yīng)大于30㎡,房間門應(yīng)朝疏散方向開啟。
(2) The number of floors of the project plank house shall not exceed 2, and the building area of each floor shall not exceed 300 m2, and when it is more than 200 m2, the number of evacuation stairs shall not be less than 2. The large distance from the room door to the stair shall not be greater than 25m, and the clear width of the stair shall not be less than 1.1m. The building area of the dormitory room should not be more than 30 m2, and the room door should be opened towards the evacuation direction.
(3)工程板房安裝完成后,應(yīng)由安裝單位進(jìn)行自檢,經(jīng)自檢合格后應(yīng)由施工總承包單位組織監(jiān)理單位、使用單位、安裝單位進(jìn)行聯(lián)合驗(yàn)收,合格后方可交付使用。
(3) After the installation of the prefabricated house, the installation unit shall conduct self inspection. After the self inspection is qualified, the general contractor shall organize the supervision unit, the user and the installation unit to conduct joint acceptance, and the house can be delivered for use only after it is qualified.
濟(jì)南工程板房
二、工程板房硬性要求——防火
2、 Hard requirements for engineering board room - fire protection
(1)所有臨時(shí)工程板房材質(zhì)須為新型阻燃材料,臨時(shí)工程板房建筑層數(shù)都不超過2層,并按要求設(shè)置疏散樓梯。
(1) All temporary project plank houses must be made of new flame retardant materials. The number of floors of temporary project plank houses shall not exceed 2, and evacuation stairs shall be set as required.
(2)臨時(shí)工程板房防火部位須配置合格、有效、數(shù)量充足的滅火器材,并專人負(fù)責(zé)定期檢查、維護(hù)、保養(yǎng)。
(2) Qualified, effective and sufficient fire fighting equipment shall be provided at the key fire prevention parts of the temporary project plank house, and special personnel shall be responsible for regular inspection, maintenance and repair.
(3)臨時(shí)工程板房用電須符合《施工現(xiàn)場(chǎng)臨時(shí)用電技術(shù)規(guī)范》要求,宿舍、辦公用房內(nèi)不允許使用大功率電器和私拉亂接電線等。
(3) The electricity used in the temporary project board room must comply with the requirements of the Technical Code for Safety of Temporary Electricity Use on Construction Site. It is not allowed to use high-power electrical appliances and connect wires without permission in the dormitories and office rooms.
(5)臨時(shí)工程板房搭設(shè)完畢后,要經(jīng)過建設(shè)、監(jiān)理、施工單位及生產(chǎn)廠家對(duì)臨時(shí)用房的結(jié)構(gòu)性能、室內(nèi)用電、消防設(shè)施等共同進(jìn)行驗(yàn)收,驗(yàn)收合格后方投入使用。
(5) After the erection of the temporary project plank house, the construction, supervision, construction unit and manufacturer shall jointly check and accept the structural performance, indoor electricity, fire fighting facilities, etc. of the temporary house, and put it into use after passing the check and acceptance.
(6)不得攜帶易燃易爆物品進(jìn)入宿舍、辦公用房、會(huì)議室等人員密集的地方。
(6) Inflammables and explosives shall not be carried into the dormitory, office space, meeting room and other crowded places.
工地工程板房搭建有哪些施工要求?我們從兩大方面來為您講解了這個(gè)問題,您在搭建時(shí)要多注意細(xì)節(jié)問題,保障工程的質(zhì)量才行。更多相關(guān)內(nèi)容就來我們這里http://hxwjw.org.cn咨詢了解吧!
What are the construction requirements for the construction of plank houses on the construction site? We explained this problem to you from two aspects. You should pay more attention to the details when building to ensure the quality of the project. Come here for more information http://hxwjw.org.cn Ask and understand!

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

欧美性爱影音先锋| 久久久久久久9| 色五月丁香综合| 综五月婷婷| 99国产精品一区二区三区无码吞精| 西安市| 玖玖爱| 免费毛片A级| 国产粉嫩在线| 亚卅国产一区二区三区| 一级滛片| 亚洲酒色网| 国产精品美女久久久久AV超清 | 男女性爱乱伦视频| 色五月婷婷性爱视频| 综合伊人久久| 性天堂免费| 久久一页| 婷婷丁香六月天伊人网| 亚洲激情图片在线| 久久久av电影| 日韩AV一区二区精品不卡| 黄色三级网址| 热东京十万AⅤ导航| 91理论在线| 大香蕉夜夜上| 国产91精品高潮白浆喷水| 日本欧美一区二区三区在线播放| 日日日天天日| 双腿张开被9个黑人调教影片| 色吧| 麻豆国产成人精品| 日韩亚洲欧美中文高清在线| 日韩在线成人| 99国产热| 国产精品国产三级国产av| 国产馆一区二区| 鸥美精品中文在线观看| 51精品国自产在线| 大香蕉国产视频| 精品影院日韩~欧美一中文字幕|