濟南工程板房的基礎(chǔ)與任何建筑一樣,基礎(chǔ)決定上層建筑,符合標準的基礎(chǔ)能夠保證板房使用期間的性和舒適度。因此,臨建板房的基礎(chǔ)一定要符合板房的標準。
The foundation of the engineering plank house is the same as any building. The foundation determines the superstructure. The standard foundation can ensure the safety and comfort of the plank house during its use. Therefore, the foundation of temporary plank house must conform to the standard of plank house.
板房(T型板房)要求條型基礎(chǔ)400*400mm,且同時須要做好地坪,地坪和基礎(chǔ)一樣水平,即為平板基礎(chǔ);而標準板房(K型板房)只要先做好條型基礎(chǔ)300*300mm就可以安裝板房了
The plank house (T-shaped plank house) requires a strip foundation of 400 * 400mm, and at the same time, the floor must be well prepared. The floor is the same level as the foundation, that is, the slab foundation; The standard plank house (K-type plank house) can be installed as long as the strip foundation of 300 * 300mm is completed first
根據(jù)場地條件和條型基礎(chǔ)圖紙,釘好基礎(chǔ)模板,再用普通混凝土澆灌,并保持基礎(chǔ)面水平,如果場地為回填土,則需夯實和鋪墊層,并視場地情況可放幾根鋼筋,以保證基礎(chǔ)整體在板房使用期間不會下沉。
According to the site conditions and strip foundation drawings, the foundation formwork shall be nailed first, then ordinary concrete shall be used for pouring, and the foundation surface shall be kept horizontal. If the site is backfilled, it shall be tamped and paved, and several reinforcements can be placed according to the site conditions to ensure that the foundation will not sink during the use of the plank house as a whole.
安裝K房后,再做室內(nèi)地坪,這樣可憑隔墻板底端和地梁確定地坪的厚度,只要地坪比地梁高,雨水就不會滲進板房室內(nèi),如果安裝K房提供平板基礎(chǔ)就有可能雨水倒流,導致室內(nèi)漏水。
After the installation of room K, the indoor floor shall be made, so that the thickness of the floor can be determined by the bottom of the partition board and the floor beam. As long as the floor is higher than the floor beam, the rainwater will not penetrate into the room. If the installation of room K provides a flat foundation, the rainwater may flow back, causing indoor water leakage.
注意,安裝板房須要做條型基礎(chǔ)400*400mm,并且同時要做好地坪;若不同時做好地坪,會影響板房的安裝質(zhì)量,所以板房的安裝基礎(chǔ)要求,須是基礎(chǔ)和地坪同時做好。
Note that the strip foundation 400 * 400mm shall be made for the installation of plank house, and the floor shall be prepared at the same time; If the floor is not prepared at the same time, the installation quality of the plank house will be affected. Therefore, the installation foundation of the plank house must be prepared at the same time with the floor.
What is the standard for the foundation of engineering plank house? The above contents can be used as reference, and more related matters can be found on our website http://hxwjw.org.cn Consult!