工程板房想要保證質(zhì)量過關(guān),就要做好驗收環(huán)節(jié)。不然在使用過程中就會出現(xiàn)各種各樣的問題,導(dǎo)致居住質(zhì)量下降,那么工程板房應(yīng)該如何驗收呢?下面
濟南工程板房廠家就給大家介紹介紹:
In order to ensure the quality of the prefabricated house, it is necessary to do a good job in the acceptance process. Otherwise, there will be various problems in the use process, resulting in the decline of living quality, so how should the engineering plank house be accepted? Next, the manufacturers of prefabricated houses in Jinan will introduce to you:
1、先看工程板房的外觀,顏色應(yīng)該整體協(xié)調(diào)。工程板房的制造商在出廠前應(yīng)仔細(xì)檢查工程板房的安裝部件是否合格,焊接是否牢固。
1. First of all, look at the appearance of the engineering prefabricated house. The color should be coordinated as a whole. The manufacturer of the engineering prefabricated house shall carefully check whether the installation parts of the engineering prefabricated house are qualified and whether the welding is firm before leaving the factory.
2、工程板房安裝完畢后,務(wù)必檢查其防火性能,檢查房屋內(nèi)的電線是否隱藏在防火管道中。檢查彩鋼夾芯板的內(nèi)外層是否破損,不要暴露出中間的保溫隔熱層。
2. After the installation of the engineering plank house, be sure to check its fire performance and check whether the wires in the house are hidden in the fire pipes. Check whether the inner and outer layers of the color steel sandwich panel are damaged, and do not expose the middle thermal insulation layer.
3、檢查工程板房的門窗滑動是否靈活,鎖是否牢固。連接件和緊固件應(yīng)牢固結(jié)合,工程板房的框架不松動。
3. Check whether the doors and windows of the engineering plank house slide flexibly and whether the lock is firm. The connectors and fasteners shall be firmly combined, and the frame of the engineering plank house shall not be loose.
4、工程板房的涂漆部分應(yīng)具有相同的色調(diào),外墻板的保護層不應(yīng)出現(xiàn)褪色或脫落的現(xiàn)象。走廊和樓梯欄桿應(yīng)光滑無毛刺。工程板房的地板也應(yīng)固定牢固。
4. The painted part of the engineering plank house shall have the same color, and the protective layer of the outer wall panel shall not fade or fall off. Corridors and stair railings shall be smooth and free of burrs. The floor of the engineering plank house shall also be fixed firmly.
5、看墻板、門、窗和工程板房的結(jié)構(gòu)部分是否有光進入,組裝后應(yīng)該沒有可見的光。如果出現(xiàn)光泄漏,則意味著工程板房的隔熱性能不是很好。如果有間隙的話,還會漏風(fēng)。
5. Check whether there is light entering the wall panels, doors, windows and the structural parts of the engineering plank house. There should be no visible light after assembly. If there is light leakage, it means that the thermal insulation performance of the engineering plank house is not very good. If there is a gap, there will be air leakage.
6、屋頂,門窗,工程板房的墻壁,地面無漏水。頂板和支撐構(gòu)件具有可靠的連接,否則如果遇到諸如強風(fēng)的惡劣天氣,工程板房的屋頂就會很容易遭到損壞。
6. There is no water leakage on the roof, doors and windows, the walls of the engineering plank house, and the ground. The roof and supporting members have reliable connection, otherwise the roof of the engineering plank house will be easily damaged in case of severe weather such as strong wind.
This is the work that must be done to ensure the quality of the prefabricated house. If you have any questions about this, please contact us to deal with it http://hxwjw.org.cn Solve it!