鋼結(jié)構(gòu)活動(dòng)板房是目前使用為廣泛的臨時(shí)住房建筑,雖然活動(dòng)房的主要骨架是鋼結(jié)構(gòu)的,但它的地基可不是,大多數(shù)地基是混凝土結(jié)構(gòu)的,鋼結(jié)構(gòu)活動(dòng)板房對(duì)地基的硬度有一定要求,地基的硬度決定了要不要做特殊處理,打好地基對(duì)于工程來說關(guān)重要。
Steel structure prefabricated houses are currently widely used temporary housing buildings. Although the main skeleton of the prefabricated house is steel structure, its foundation is not. Most foundations are concrete structures, and steel structure prefabricated houses have certain requirements for the hardness of the foundation. The hardness of the foundation determines whether special treatment is necessary, and laying a good foundation is crucial for the project.
1.要進(jìn)行硬度測(cè)試,特殊的地形和地基的硬度對(duì)建造活動(dòng)房來說有較大的差別,應(yīng)當(dāng)作特殊的處理,保證鋼結(jié)構(gòu)活動(dòng)板房可以順利安裝,確保其質(zhì)量,技術(shù)人員應(yīng)該提前進(jìn)行測(cè)量。
Firstly, hardness testing should be conducted. Special terrain and foundation hardness have significant differences for the construction of prefabricated houses, and special measures should be taken to ensure the smooth installation of steel structure prefabricated houses and their quality. Technical personnel should conduct measurements in advance.
2.完成了地基的測(cè)量后,接下來就是基礎(chǔ)澆筑,這時(shí)的在于必須先測(cè)量好水平,在完成了澆筑后,應(yīng)該控制水平的誤差在10mm內(nèi)。必須要保證基礎(chǔ)面水平在誤差以內(nèi),這樣才不會(huì)影響后續(xù)的工作進(jìn)程。
禹城鋼結(jié)構(gòu)板房
After completing the measurement of the foundation, the next step is foundation pouring. At this point, the key is to measure the level first. After completing the pouring, the horizontal error should be controlled within 10mm. It is necessary to ensure that the level of the foundation surface is within the error range, so as not to affect the subsequent work process.
3.混凝土標(biāo)號(hào),一般情況下基礎(chǔ)為c20且內(nèi)無鋼筋,當(dāng)然,在特殊的地形或者其他不可抗拒的條件下,應(yīng)當(dāng)根據(jù)技術(shù)人員的測(cè)定來頂下終方案。
3. Concrete grade, usually based on c20 and without steel bars inside. However, in special terrain or other irresistible conditions, the final plan should be determined based on the determination of technical personnel.
4.澆注時(shí)間,跟常規(guī)的混凝土澆筑工藝一樣,鋼結(jié)構(gòu)活動(dòng)板房同樣不可以減少工藝程序,基礎(chǔ)澆筑完成后或者活動(dòng)板房安裝之前應(yīng)該留充分的時(shí)間讓混凝土達(dá)到硬度要求。
4. Pouring time: Like conventional concrete pouring processes, steel structure prefabricated houses cannot reduce the process procedures. After the foundation pouring is completed or before the installation of the prefabricated house, sufficient time should be left to ensure that the concrete meets the hardness requirements.
5.澆筑,制作基礎(chǔ)的同時(shí),必須跟室內(nèi)地面一起澆筑完成,水平高度跟基礎(chǔ)一樣,這樣可以確保安裝工期、質(zhì)量以及安裝后的美觀?;顒?dòng)板房安裝好了以后,在室內(nèi)鋪地板,這樣既方便又整潔。
5. Pouring, while making the foundation, must be completed together with the indoor floor, with the same horizontal height as the foundation, to ensure the installation period, quality, and aesthetics after installation. After the installation of the prefabricated house, the floor should be laid indoors, which is both convenient and tidy.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

色多多av| 女人扒开裤子让男人桶| 久久精品国产亚洲AV无码麻豆| 日韩AV在线不卡一区| 自由偷拍春色| 国产一区二区日韩欧美| 国产91网| 精品无码AV一级爽爽爽爽| 日韩免费视频国产精品| 久久伊人中文字幕| 三上悠在线视频| 草莓视频在线观看国产| 九九99久久精品国产| 久月AV| 高清97射| 奶头好大揉着好爽gif动态| 污视频一区视频| 秋霞无码一区二区| 中文精品一区二区| 97精品一区二区三区| 天天干A| 涩Av无码| 少妇做受高潮| 激情影院东京热苍井空| 久久综合精品五月丁香| 亚洲伊人丝袜精品久久| 97精品免费久久| 谁知道日韩黄色网址| 国产婷婷色综合AV性色AV| 狂操日韩禁果AV| 男人天堂一区二区三区| 亚洲国产成人精品无码区在线网站 | 免费十国产十无码| 精品少妇无码av无码| 77777亚洲午夜久久多人| 日本麻豆黄网| 日韩无码国产艹艹| 真实国产精品视频400部| 蜜桃99在线| 公公吃我奶水中文字幕| 中文字幕成人精品久久不卡|