1、 基層處理

1. Grassroots treatment

確認(rèn)待安裝處無灰塵、無油脂、無銹蝕、無松動(dòng)等,表面干燥,如有防潮防腐需求,可適當(dāng)采取涂層處理,找平層達(dá)到要求,基層驗(yàn)收合格。

Confirm that the installation site is free of dust, grease, rust, looseness, etc., and the surface is dry. If there is a need for moisture-proof and anti-corrosion, appropriate coating treatment can be taken. The leveling layer meets the requirements, and the base layer is accepted as qualified.

2、 彈線控制和懸掛基準(zhǔn)線

2. Spring line control and suspension reference line

根據(jù)建筑實(shí)際立面設(shè)計(jì)和外墻技術(shù)要求,彈出門窗水平線、垂直控制線和裝飾縫線等,在建筑外陰陽(yáng)角和其他適當(dāng)處懸掛垂直基準(zhǔn)線和水平線,以確保安裝平整度和垂直度符合施工要求。

According to the actual facade design and external wall technical requirements of the building, draw horizontal lines, vertical control lines, and decorative stitching lines for doors and windows. Hang vertical reference lines and horizontal lines at the external corners and other appropriate positions of the building to ensure that the installation flatness and verticality meet the construction requirements.

20230315111136716.jpg

3、鋪設(shè)施工

3. Laying construction

挑選合適的彩鋼巖棉復(fù)合板,規(guī)格和外觀尺寸偏差均在規(guī)定范圍內(nèi),裁剪下料后,按設(shè)計(jì)要求選擇復(fù)合板橫向還是豎向布置(注意橫向布置時(shí)每塊板兩個(gè)卡件,豎向布置時(shí)板上下左右各一個(gè)卡件),并用膨脹螺栓錨卡件進(jìn)行固定,拼縫大小符合施工要求,板和氈的接頭對(duì)接一定要十分緊密,在多層保溫時(shí)各十字接縫應(yīng)交錯(cuò)分開,避免形成熱橋和冷橋。

Select a suitable color steel rock wool composite board with specifications and dimensional deviations within the specified range. After cutting and cutting, choose whether to arrange the composite board horizontally or vertically according to the design requirements (note that there are two cards for each board when arranged horizontally, and one card for each board on the upper, lower, left, and right sides when arranged vertically), and fix it with expansion bolts anchor cards. The joint size should meet the construction requirements, and the joint connection between the board and felt must be very tight, When using multi-layer insulation, the cross joints should be staggered and separated to avoid forming hot and cold bridges.

4、 涂抹膠粘劑

4. Applying adhesive

按比例要求配制彩鋼巖棉復(fù)合板專用膠粘劑,充分?jǐn)嚢韬蟮哪z粘劑應(yīng)色澤均勻、新鮮良好、稠度適宜,粘度要達(dá)到使剛粘貼上的巖棉板不會(huì)下垂。將配制好的膠粘劑按規(guī)定厚度,均勻地涂抹在巖棉板上,可采用條形點(diǎn)粘方式進(jìn)行粘接,以確保牢固可靠。

Prepare special adhesive for color steel rock wool composite board according to the proportion requirements. After thorough mixing, the adhesive should have a uniform color, good freshness, appropriate viscosity, and a viscosity that ensures that the newly pasted rock wool board will not sag. Apply the prepared adhesive evenly to the rock wool board according to the specified thickness, and use a strip point bonding method to ensure firmness and reliability.

本文由禹城彩鋼復(fù)合板友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://hxwjw.org.cn真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待

This article is a friendly contribution from Yucheng Color Steel Composite Board. For more related knowledge, please click: http://hxwjw.org.cn Sincere attitude. We will provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Stay tuned

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

美少妇| 久久综合色站| AV日穴| 亚洲精品不卡在线观看| 国产高清AV| 高清不卡无码视频| 久久中文字幕网站| 黄色网站大色片| 国产女王白浆| 在线看片免费不卡人成视频| 久久官网| 四虎影视海外入口| 亚洲 日本 国产| 成人精品在线99视频| 亚洲一区二区三区无码久久精品| 伊人久久一区| 少妇不卡免费在线视频| 久久黄色三级片网站| 亚洲欧美推出| 一区二区三区午夜无码视频| 中文字幕第6页| 天天干天天射2023| 日本在线国产视频| 久久人妻无码捆绑| 神马在线影院| 成人日韩熟女高清视频一区| 在线亚洲视频网站| GOGO美女在线视频| 久久线免费视频| 日韩精品中文字幕在线观看| 六月伊人久久| 免费国产a国产女厕所| 91国语性爱| 五月六月丁香婷婷激情| 麻豆艾秋| 樱花蜜臀蜜桃视频网站| 中国XXXXX无码| 欧美国产一区二区三区| 日本一码二码三码视频| 激情人妻99| 老熟妇网络|